56 inches 1/2 between          
CN truck spécial equipment to repair urgent defect on the tracks in this case they repair the level of the track taking oof the nails and lift the track and fill in under rock to level the track and add wood pieces in hole to replace nails in before check with mesure tape if the track are at 56inches1/2 between the two track
Date: 5/23/2011 Location: St-Lambert, QC CA Country Flag   Map Show St-Lambert on a rail map Views: 349 Collection Of:   JEAN-PIERRE BROSSARD
Author:  JEAN-PIERRE BROSSARD
56 inches 1/2  between
Picture Categories: Track,Action This picture is part of album:  mtl®ions trains photos
Share
User Comments
Name Type Comments Date
Steve Coraggio General Great action shot 5/25/2015 9:12:35 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2703227